Readiness

Will every part be on site before the job starts?

Readiness reads a turnaround's or project's exports and shows, line by line, which parts won't be in hand by the material-ready date, which long-lead items are past saving, and who has to act today.

fullkit · readinessT−22
TAR-A secured behind
69%against a glide path of 84%
Can't arrive in time
65lines, including 2 long-lead items
Work packages secured vs glide path
E-104A42%
C-10155%
P-102A80%
F-10190%
E-41037%
What it shows

Answers, then actions.

Best 3 to 9 months before a turnaround, shutdown, outage or project start.

Quantity, not paperwork

Each required line is filled from stock, then received orders, then open orders. A request or a PO isn't coverage until the numbers add up, in time.

Glide path for every work package

Secured against where you should be by today, given how far you are from scope baseline to material ready. Red, amber or green, with the reason.

Can't-make-it list

Lines whose lead time from today already runs past the need date, flagged while there's still time to expedite, re-source or move the date.

Action queue by owner

Every open line routed to buyer, planner, scope owner, engineering or materials control, soonest need first.

Process findings

Demands raised late or after scope freeze, findings dispositioned late, scope added after freeze. Kept apart from readiness so the picture stays honest.

Full results in Excel

Event summary, work packages, every line, the action queue and the findings, ready to send to each owner.

What you load, what you get

Your reports in. A worklist out.

Excel or CSV straight from your system. Fullkit matches the columns and shows you sample values before it runs.

You load

  • Required materials per work order or work package
  • Reservations or material requests (with allocated and short quantities)
  • Purchase order lines
  • Milestone dates: scope freeze, material ready, start
  • Item master with lead times (optional)

SAP: workscope or BOM list, MB25 reservations, ME2N
Odoo: Manufacturing or Repair order components, stock moves, purchase lines
Oracle, IFS, Maximo: work order material, reservations, PO lines
Any Excel tracker with part, quantity and order

You get

  • A board of every work package against its glide path
  • Lines that can no longer arrive in time
  • An action queue per owner, by need-by date
  • Process breaches and unplanned demand
  • Everything exported to Excel
Start here

Send us your column headers.

Not your data. Just the column names from your exports. We'll come back with the mapping and a short written proposal, all by email.